Oil Plus 2C Flooring Aftercare
Do not tape anything to the finish!
After treatment with Rubio Monocoat Oil Plus 2C, the floor requires 7 days to fully cure and harden if both components, (Part A & B) were used, or 3 weeks if Part A only was used.
After the flooring has fully cured, the floor can be maintained using Rubio Monocoat cleaning and maintenance products.
To Maintain Matte Appearance
Use Rubio Monocoat Soap, diluted with water as needed, after initial curing period.
For flooring finished with Part A only
During the first week, it is advisable to only clean the flooring with a vacuum cleaner or a dust mop, fitted with a dry cloth. Do NOT use a damp cloth!
During the second and third week, a damp cloth soaked in clean water and wrung out thoroughly, can be used with care.
Invalid Password
Enter